Police Headquarters

Police Headquarters

New Generator Installation

New 275 Kva Generator, New ATS and Load Bank Connection Point C/W Bypass facility

A New Generator was supplied for the non-Essential switchboard

Modifications to the switchboard to include a Bus Coupler between essential and non-Essential to increase resilience on site

New Bunded Fuel pipes from and existing Bulk tank to the new Generator bunded base tank

New Fuel Transfer system on the non-Essential Generator

Full System check on Bus Coupler and switching methodology

Recent Case Studies

At GMI Power Solutions we want to keep you up to date with our recent work at GMI Power.

Wedge House is part Hotel and part offices, located by Blackfriars Bridge London.

Wedge House is part Hotel and part offices, located by Blackfriars Bridge London.

Wedge House is part Hotel and part offices, located by Blackfriars Bridge London.